Based on the design flood achievement of the river basin flood control planning and comprehensive planning, the related design flood information were collected and the series of flood were extended in applying restoring calculation and frequency curve fitting analysis. The review and revision of the design flood in seven major basins were completed over several years. The revision projects of design flood mainly included design flood peak and flood volume in different frequency, and the representative of design flood is better after revising. TTiis paper introduced the results of design flood revision and changes in the seven basins, and analyzed the different factors affecting the design flood. The revision of design flood is recommended by comparing with the previous approval results.
[1]王国安.对我国水利水电工程设计洪水标准存在问題的认识m.人民 黄河,1987,06:9-13. (WANG Guoan. The problems of the design flood standards of water resources and hydropower projects in China [J]. Yellow River, 1987,06:9-13. (in Chinese))
[2] SDJ22-79,水利水电工程设计洪水计算规范(试行)[S]. (SDJ22-79, Regulation for Calculation Design Flood of Water Resources and Hydropower Projects [S]. (in Chinese))
[3] SL44-93,水利水电工程设计洪水计算规范[S]. (SL44-93,Regulation for Calculating Design Flood of Water Resources and Hydropower Projects [S]. (in Chinese))
[4] SL44-2006,水利水电工程设计洪水计算规范[S]. (SL44-2006, Regulation for Calculating Design Flood of Water Resources and Hydropower Projects [S]. (in Chinese))
[5] XU Changjiang, GUO Shenglian, YIN Jiabo, et al. Comparative study of different design flood estimation methods [J]. Journal of Water Resources Research,2016,5(2):127-135.
[6]郭生练,刘章君,熊立华.设计洪水计算方法研究进展与评价[J].水 利学报,2016,47⑶:302-314. (GUO Shenglian, UU Zhangjun, XIONG Lihua. Advances and assessment on design flood estimation methods [J], Journal of Hydraulic Engineering, 2016,47(3) :302-314. (in Chinese))
[7]张建中,毛慧慧.下垫面变化条件下设计洪水修订方法研究m.水 利水电技术,2012,43(12):l-4+8. (ZHANG Jianzhong, MAO Huihui. Study on methods for modification of design flood under condition of change of underlying surface [J]. Water Resources and Hydropower Engineeringf 2012,43(12):1-4+8. (in Chinese))
[8]丛娜,冯平.流域下垫面变化影响下入库设计洪水的修订[J].南水北调与水利科技,2014,1202:6-10. (CONG Na, FENG Ping. Revision on reservoir inflow desi^i flood under the variation impact of underiying surface [J]. South-to-North Water Transfers and Water Science & Technology, 2014,1202:6-10. (in Chinese))
[9]高诚,孙天青.设计洪水成果修订方法及成果分析[J].水利水电工程 设计,2017,3604:26-28. (GAO Cheng, SUN Tianqing. TTie revision method of design flood and its analysis [J]. Design of Water Resources and Hydroelectric £ngineering,2017,3604:26 -28. (in Chinese))