汛限水位动态控制方法在碧流河水库的应用分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV697.13

基金项目:


Application of Dynamic Control of Limit Level before Flood in Biliuhe Reservoir
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    "碧流河水库汛限水位设计与运用研究"成果于2004年经水利部松辽委批复,正式投入运行.在2005~2008年的洪水调度中,在利用气象部门短期降雨预报成果的前提下,采用预蓄预泄动态控制方法对实时洪水进行调节.分析结果表明,在不增加水库运行风险的前提下,应用汛限水位动态控制方法,能增加水库蓄水,效益显著.

    Abstract:

    The method of dynamic control of limit level before flood was used in the Biliuhe Reservoir from 2005 to 2008,during which flood control was made by using the short-term rainfall forecasting data from the meteorology departments,and regulation of real time floods by using the dynamic regulation method of pre-storage and pre-discharge.The results show that the reservoir storage can be increased by using the method without increasing the reservoir operation risk.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: