Abstract:This paper introduced how to forecast the variation of runoff in the future and estimate the reliability of the water supply source system in operational period,by using the weighted and fuzzy Markov's Chain Model.The author defined the risk of water supply in plain reservoir through the probability if the water demand is bigger than project's carrying capacity,and elaborated the risk analysis of water supply source system and the simulation method.