由DEM确定R-V地貌瞬时单位线的研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P338

基金项目:


Study on R-V GIUH by Use of DEM
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了地貌瞬时单位线(R-V GIUH)的基本理论与理论基础。由于以往确定流域单位线需要大量的降雨径流实测资料,试图应用地理信息系统(GIS)技术建立流域数字高程模型(DEM),从而可以仅依据地形资料来确定R-V地貌瞬时单位线,解决无资料地区的洪水预报问题。以长江三峡区间沿渡河流域为例,取得了较好的成果。

    Abstract:

    The basic theory of R-V GIUH is introduced.Due to a lot of data of precipitation and runoff are needed when determining a basin's unit hydrograph,the method of applying Geographic Information System(GIS)to establish basin's Digital Elevation Model(DEM)is presented.The unit hydrograph can be determined only on the basis of topographic date to resolve the problem of the flood forecasting in the data shortage region.The method is applied in Yanduhe River Basin of Three Gorges Interval of Yangtze River and the results are satisfactory.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2002-03-11
  • 录用日期:
  • 在线发布日期:
  • 出版日期: