Abstract:On the basis of analyzing the river conditions, and hydrological and meteorological characteristics in cold mountain areas, this paper discussed the cause of ice dam forming, and calculated the channel flow, snowmelt runoff and rainfall runoff. And then a model was set up a model to forecast the highest level of ice dam, so as to improve the traditional forecasting methods and increase the forecasting accuracy.