    摘要:

    朱沱、寸滩水文站是三峡水库主要入库控制站。通过对朱沱站1975~2001年、寸滩站1966~2001年实测卵石推移质资料分析,结果表明,朱沱站从1991起、寸滩站从1981年起,卵石推移量系统减少,粒径细化,起动流速增加,水沙关系明显变化。河道采砂、水利工程拦沙、水土流失治理是三峡水库入库推移质输沙特性发生变化的主要原因。

    Abstract:

    Zhutuo and Cuntan gauging station are the main reference points into Three Gorges Reservoir. The survey data of gravel bed load in Cuntan station from 1996 to 2001 and Zhutuo station from 1975 to 2001were analyzed. It was found that the bed load transportation has decreased systemically, the sediment granule diameter has become smaller, the sand starting flow velocity has aggrandized and the relation between flow and sand has changed obviously in Cuntan station since 1981 and Zhutuo station since 1991. Finally, it was concluded that the variations be caused by more sediment excavated from the watercourse and more water works block and keep water and soil from running off.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: